Doddajala metro station

Upcoming Namma Metro station under Blue Line

13°11′19″N 77°38′42″E / 13.18860°N 77.64487°E / 13.18860; 77.64487Owned byBangalore Metro Rail Corporation Ltd (BMRCL)Operated byNamma MetroLine(s)Blue LinePlatformsSide platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)Tracks2 (TBC)ConnectionsMainline rail interchange Doddajala Halt railway stationConstructionStructure typeElevated, Double trackPlatform levels2 (TBC)Parking(TBC)Accessible(TBC)Other informationStatusUnder ConstructionStation codeDDJ (TBC)HistoryOpeningJune 2026; 23 months' time (June 2026) (TBC)Electrified(TBC)Services
Preceding station Namma Metro Following station
Chikkajala
towards Krishnarajapura or Central Silk Board
Blue Line
(Future Service)
Airport City
Route map
Legend
Central Silk Board
Yellow Line
Under Construction
HSR Layout
Agara
Ibbaluru
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Doddanekundi
DRDO Sports Complex
Sarasvathi Nagar
Krishnarajapuram Krishnarajapuram railway station
Purple Line
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under Construction
Veerannapalya
Kempapura
Orange Line
Planned
Hebbal Hebbal railway station
Kodigehalli
Jakkur Cross
Jakkur Plantation (No Scope)
Yelahanka
Bagalur Cross
Bettahalasuru (No Scope)
Chikkajala
Doddajala
Mainline rail interchange Doddajala Depot (U/C)
Airport City
KIAL Terminals
Location
Map

Doddajala is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will consist of the main ITC Limited office followed by the main Navayuga Devanahalli Tollway Pvt Ltd which will lead towards Kempegowda International Airport in the form of Trumpet Interchange and towards Devanahalli, Nandi Hills, Chikkaballapur, Penukonda (Andhra Pradesh) and capital city of Telangana, Hyderabad.

This station will be considered as the depot station which will hold all Namma Metro's Blue Line trainsets for maintenance purposes. This metro station is slated to be operational around June 2026.[2][3][4][5]

Station layout

Station Layout - To Be Confirmed

Doddajala track layout (TBC)
Legend
P#
P#
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board next station is Chikkajala
Platform #
Northbound
Towards ← KIAL Terminals next station is Airport City
Side platform | Doors will open on the left Disabled access
L2

Connections

Entry/Exit

See also

Portals:
  • icon Bangalore
  • icon Trains
  • icon Transport
  • icon Engineering

References

  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.

External links

  • BMRCL English Archived 30 June 2019 at the Wayback Machine - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.